
Titans Grip · COMBAT
Aikido AI
The Way of Harmony
Record your techniques. Your AI coach reads your balance, entries, and ukemi — and shows you where harmony breaks.
Тренер Sensei Kenji
AI Aikido coach
What does Aikido AI do?
Aikido AI is an AI aikido coach for iPhone. Upload a clip on the dojo floor, get a 0 to 100 form score, frame-by-frame mistake detection, and a drill plan from Sensei Kenji.
Built for aikidokas who want their phone to grade their technique the way a coach would.
- Techniques scored
- 10
- Coach
- Sensei Kenji
- Governing body
- IAF / Aikikai
- Platform
- iOS only
Platform availability
iOS only
- Apple App Store
- iPhone and iPad (iOS 17+)
- Android, Web, Wear OS
- Not available
Aikido AI is a native iOS application available on iPhone and iPad through the Apple App Store. There is no Android version, and no web app. The AI video analysis pipeline runs on Apple's neural engine, which is why we ship iOS only.
Open in App StoreВаш ИИ-тренер
Sensei Kenji
“Welcome to the dojo. I am Sensei Kenji.”
throws, joint locks, pins, ukemi, ki development
AI Video Analysis
Upload footage and get scored 0-100 with frame-by-frame feedback.
AI Coach Chat
Ask your personal AI coach anything, anytime.
Competition Countdown
Track your next event with smart preparation milestones.
Nutrition Engine
Sport-specific meal plans and macro tracking.
Training Log
Log sessions, track volume, and monitor progress over time.
Technique Library
Browse and study every technique in your sport.
App Store Preview
See Aikido AI before you download
This English-language gallery comes from the app's U.S. App Store listing. Swipe through it, then open Apple's listing to check the latest version, compatibility, and purchase options.

Review your Aikido technique score and see what to improve.Screen 01 / 06 
Speak your session details and save them to your training log.Screen 02 / 06 
Run a reactive drill with four speed profiles.Screen 03 / 06 
Track your Aikido training, weight, streaks, and progress.Screen 04 / 06 
Capture your meals and Aikido sessions in today's log.Screen 05 / 06 
Ask Sensei Kenji for Aikido training guidance.Screen 06 / 06
Техники
Техники: Aikido
Освойте базу и продвинутые приёмы в дисциплине aikido
FAQ
Часто задаваемые вопросы
Aikido AI is an AI-powered Aikido coaching app for iOS. It features Sensei Kenji, a dedicated AI coach that provides video analysis with 0-100 scoring, personalized training plans, technique breakdowns, nutrition tracking, and competition preparation tools. The app includes a library of 10+ Aikido techniques.
Yes. Aikido AI includes AI-powered video analysis that scores your Aikido technique from 0 to 100. Upload or record footage directly in the app, and Sensei Kenji will provide frame-by-frame feedback on your form, timing, and execution. This helps you identify specific areas for improvement in your training.
Aikido AI is free to download from the App Store. A subscription unlocks all features including AI video analysis, coaching, training plans, and nutrition tracking. A free trial is available so you can experience everything before committing.
Aikido AI is currently available exclusively on iOS (iPhone and iPad) through the Apple App Store. There is no Android version at this time. All Titans Grip apps are built as native iOS applications to deliver the best possible performance for video analysis and real-time coaching.
Aikido AI uses advanced AI models for video analysis, technique scoring, and personalized coaching. Sensei Kenji can analyze your Aikido movements, provide detailed feedback, create custom training plans, and answer questions about technique, strategy, and competition preparation. The AI is specifically trained to understand Aikido on the dojo floor.
Yes. Aikido AI generates personalized training plans based on your skill level, goals, and schedule. Sensei Kenji specializes in throws, joint locks, pins, and can adapt your plan as you progress. The app also includes competition countdown features to help you peak for your next tournament.
Сравнить: Aikido
Похожее
Похожие приложения
Другие приложения в категории «единоборства»